Project Eagle


October 14, 2007
- Bedroom-Bathroom Wall, Shower, Broom Closet, Bedspread, Ceiling Panel, Wiring, Nightstand Countertop Template -

It had been awhile since we closed up the floor, we had to pull out old pictures to refresh our memory about what was where under there. We needed to figure out where our plumbing was going to run.

Then it was time to start installing the shower. We had to put it in, and pull it out a dozen times while figuring the exact location of the walls, the valve and the shower head. Because of the height of the shower walls, the location of the shower ended up being about 7" out from the exterior wall of the bus. Soooo, you know me.... waste not, want not... can't waste space... I asked Art for an access door to behind the shower for a broom closet.... and he made it happen! :)


I think both of us agree the shower has been one of the more difficult tasks since we started!

We also managed to get a couple other jobs started - I'm making the bedspread, we installed another ceiling panel in the bathroom, Art finished routing the wires into the closet, and I made templates for the corian nightstand counter tops.