Project Eagle


February 1-11, 2006
Preparing for insulation

We spent the past couple weeks preparing to spray insulation. When we removed the fiberglass insulation from the ceiling, we revealed a work of art. Someone had drawn a face. It looks as though the artist took a minute to do this while they were numbering the aluminum ceiling panels.

We lined the bottom of the walls with 1" angle iron. This will give us something sturdy to secure the bottom of the wall panels to when we put those up.

We also installed the bathroom vent, so we could get some air circulating inside while spraying.

Here is a good before insulation picture.

Louis and Brian stopped by to say hi.

This is the eagle on the control panel. I used this as a model for the eagle we will have etched in the front cap window.